Home EN DE
Scinawa_Basen-2.jpg
1507-WK-ZT-100-_2016.06.jpg

Revitalision of the outdoor pool
location: Ścinawa, Królowej Jadwigi
investor: Municipal Council of the City of Ścinawa
area: 8646,50 m²
project year: 2015

The area covered by the investment includes a changing room, three pools, and a beach volleyball court. The changing room building is planned to be expanded with a covered entryway and entrance zone building. Stainless steel pools are planned for the area including attractions such as enclosed tube slides, a three-track slide, and others. A beach-like surface made of synthetic materials is planned for the area surrounding the pools. Additionally, a playground and beach volleyball court with lighting infrastructure have been planned.  



<- Back

ASPA Architectural Studio
Sp. z o.o. Sp. komandytowa 

Addres: Zielonego Dębu 6
51-621 Wrocław

telephone: +48 71 342 22 78
e-mail: grupa_wro@as-pa.pl